<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    1) Ben published draft bylaws.  We'll review/tweak this week, and
    then submit for voting.  He's continuing to investigate insurance
    policy.  I need to forward MicroHams policy info to him.  Ben will
    help with setup on Friday by way of truck.  Ben's also putting
    together the server/switch side of the Flea Market demo.  Setting up
    asterisk as one service.<br>
    <br>
    2) Curt got us a 50 minute presentation @ SeaPac!!!  Details
    forthcoming.  He'll forward background image to Ben for banner
    creation, and will submit own design if possible.  Curt will engage
    with Seattle ACS folks to see how HamWAN can help their emergency
    activities.<br>
    <br>
    BANNER DESIGN MUST BE SUBMITTED TOMORROW<br>
    <br>
    3) Cory's back and working on 802.1x/authentication.  Was off the
    last 2 weeks.  Will supply SIP phone for Flea Market.<br>
    <br>
    4) Rob couldn't attend but here's his update:<br>
    <br>
    <p class="MsoNormal"><span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D">Greetings
        all,<o:p></o:p></span></p>
    <p class="MsoNormal"><span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D">I
        will be unable to make >this< meeting tomorrow, due to
        >another< meeting.  Perhaps we should have a meeting about
        scheduling meetings? (no, just kidding)<o:p></o:p></span></p>
    <p class="MsoListParagraph" style="text-indent:-.25in;mso-list:l2
      level1 lfo2"><span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D"><span
          style="mso-list:Ignore">1)<span style="font:7.0pt "Times
            New Roman"">      </span></span></span><span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D">Rotor
        control software progress – moderate, but not nearly fast
        enough.  Availability of time is the issue.  1<sup>st</sup> run
        in VB is probably 75% along.  Got the cable back from Scott so I
        can test.  Need to pick someone’s brain on the interface to the
        test equipment.  Do I simply poll for whatever value is
        presented (i.e. the TE is continuously sending output), or do I
        need to send a command parameter then get a response, etc, etc.<o:p></o:p></span></p>
    <p class="MsoListParagraph" style="text-indent:-.25in;mso-list:l1
      level1 lfo3"><span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D"><span
          style="mso-list:Ignore">6)<span style="font:7.0pt "Times
            New Roman"">      </span></span></span><span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D">It

        looks like I will be going to Puyallup after all.  Previous
        commitment has been cancelled.  Not sure how much time I’ll have
        between now and then, but what needs to be done?  (I’m really
        going to hate myself for asking that…)  I cannot be there late
        as we do have other commitments that evening around 6 up north.<o:p></o:p></span></p>
    <span
style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D">Rob<br>
      <br>
    </span><br>
    5) KD7ILD will contact Housing Authority about hosting sites.  Focus
    on Beacon Tower.  Other site development in progress as well.<br>
    <br>
    6) I'll setup the cell site here and generate OpenVPN creds for
    people to dial in and make sure everything is working prior to the
    Flea Market.<br>
    <br>
    General discussion points:<br>
    <br>
    1) We'll go with the full blown RF analysis display @ Flea Market. 
    Heavy, but nifty.  There will be enough people to cover the table so
    things don't get messed with.<br>
    2) New member "megor" has promised to get his ham license this
    Saturday.  Go Team Megors!<br>
    3) Banner printing will have to be local / quick.  FedEx is looking
    likely.  I'll check their rates.<br>
    4) We postponed the discussion on the FCC's Notice of Proposed
    Rulemaking.  I need to draft a response and have the board sign it
    on behalf of HamWAN.  Send it to state rep and ARRL and FCC?  We'll
    figure that out.<br>
    <br>
    Many other finer points were omitted from this email....<br>
    <br>
    --Bart<br>
    <br>
  </body>
</html>