<div dir="ltr"><div class="gmail_quote"><div dir="ltr">On Thu, Aug 30, 2018 at 9:34 AM Carl <<a href="mailto:carl@n7kuw.com" target="_blank">carl@n7kuw.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div lang="EN-US" link="blue" vlink="purple"><div class="m_8636215377716614938m_-7101628305728571809WordSection1"><p class="MsoNormal"><span style="font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1f497d">Can Nigel or Bart or another on the core HamWAN team comment on the status of the WA EMD setup? I believe the site has been evaluated, and some (all) equipment has been purchased, but nothing is installed and they are not yet on HamWAN.  This event in February seems to be a strong motivator to get that project moving.  Perhaps there is someone on this list that is adequately connected at Camp Murray to poke whomever needs to be poked to get this moving?</span></p></div></div></blockquote><div> </div><div>Camp Murray has purchased nearly all of the equipment. Bart provided a list of missing items that would need to be procured before installation. I've been CC'd on a few follow-ups to this and none have received a response from Camp Murray. In the latest, HamWAN offered to procure the missing pieces to speed up the process. No response.</div><div><br></div><div>Tom</div></div></div>