<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body>
    Hello,<br>
    <br>
    We have 4 clients connected to Baldi-S1 (a SISO sector) that are
    kind of silly:<br>
    <br>
    <tt> # INTERFACE  RADIO-NAME       MAC-ADDRESS       AP  SIGNAL...
      TX-RATE UPTIME</tt><tt><br>
    </tt><tt> 0 wlan1      AF7PR-Baldi      E4:8D:8C:C6:F5:45 no 
      -60dBm    32.5... 2d8h51m46s</tt><tt><br>
    </tt><tt> 1 wlan1      KD7TQN-Baldi     D4:CA:6D:C2:ED:93 no 
      -65dBm    32.5... 2d8h51m32s</tt><tt><br>
    </tt><tt> 2 wlan1      N7OEP/Baldi-B... D4:CA:6D:0D:53:F9 no 
      -60dBm    32.5... 2d8h51m27s</tt><tt><br>
    </tt><tt> 3 wlan1      Rattlesnake-B... 64:D1:54:AF:3F:CD no 
      -79dBm    19.5... 1d9h35m21s</tt><tt><br>
    </tt><br>
    They're silly because the first 3 are at the same mountain top, just
    a couple hundred feet away in adjacent shacks.  This is a waste of
    prime long-range spectrum, being used to do local-links.  I'd like
    to get all the shacks @ Baldi tied together via gigabit Ethernet,
    and install access switches at the 2 other shacks so people there
    can plug into the LAN directly.  This high speed LAN between all
    shacks can then be used to allow us to address the 4th silly client,
    which is Rattlesnake Mountain.  I'd like to install a dedicated dish
    on the northernmost tower (fed by the new high speed LAN) to act as
    a dedicated high speed link between Baldi and Rattlesnake.  The dish
    on the Rattlesnake side will also need a modem upgrade to run at
    full speed, and I'm including that in this proposal.<br>
    <br>
    Here is the rough budget for this spend request:<br>
    <br>
    <table width="100%" cellspacing="2" cellpadding="2" border="1">
      <tbody>
        <tr>
          <td valign="top"><b>Item</b><b><br>
            </b></td>
          <td valign="top"><b>Quantity</b><b><br>
            </b></td>
          <td valign="top"><b>Cost</b><b><br>
            </b></td>
          <td valign="top"><b>Subtotal</b><b><br>
            </b></td>
        </tr>
        <tr>
          <td valign="top">500ft pull rope<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$12.97<br>
          </td>
          <td valign="top" align="right">$12.97<br>
          </td>
        </tr>
        <tr>
          <td valign="top">425ft duct rod<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$111<br>
          </td>
          <td valign="top" align="right">$111<br>
          </td>
        </tr>
        <tr>
          <td valign="top">Taxes for above 2 items<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$11.53<br>
          </td>
          <td valign="top" align="right">$11.53<br>
          </td>
        </tr>
        <tr>
          <td valign="top">CRS112-8P-4S-IN for northernmost building,
            feeding Rattlesnake dish w/ PoE and access ports for clients<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$170<br>
          </td>
          <td valign="top" align="right">$170<br>
          </td>
        </tr>
        <tr>
          <td valign="top">CRS326-24G-2S+RM for middle building, acting
            as mid-span switch and providing ports to lots of devices
            there<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$185.24<br>
          </td>
          <td valign="top" align="right">$185.24<br>
          </td>
        </tr>
        <tr>
          <td valign="top">Taxes for above 2 items<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$33.04<br>
          </td>
          <td valign="top" align="right">$33.04<br>
          </td>
        </tr>
        <tr>
          <td valign="top">1000ft Shielded CAT5 TC-PRO ToughCable<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$137.68<br>
          </td>
          <td valign="top" align="right">$137.68<br>
          </td>
        </tr>
        <tr>
          <td valign="top">Taxes for above<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$12.80<br>
          </td>
          <td valign="top" align="right">$12.80<br>
          </td>
        </tr>
        <tr>
          <td valign="top">Existing Inventory Estimate:
            RB921UAGS-5SHPacD-NM modem<br>
          </td>
          <td valign="top" align="center">2<br>
          </td>
          <td valign="top" align="right">$150<br>
          </td>
          <td valign="top" align="right">$300<br>
          </td>
        </tr>
        <tr>
          <td valign="top">Existing Inventory Estimate: mANT30 2ft
            microwave dish<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$120<br>
          </td>
          <td valign="top" align="right">$120<br>
          </td>
        </tr>
        <tr>
          <td valign="top">Existing Inventory Estimate: Sleeve30 2ft
            microwave dish isolation kit<br>
          </td>
          <td valign="top" align="center">1<br>
          </td>
          <td valign="top" align="right">$100<br>
          </td>
          <td valign="top" align="right">$100<br>
          </td>
        </tr>
        <tr>
          <td valign="top">TOTAL COST ESTIMATE<br>
          </td>
          <td valign="top" align="center"><br>
          </td>
          <td valign="top" align="right"><br>
          </td>
          <td valign="top" align="right">$1,194.26<br>
          </td>
        </tr>
      </tbody>
    </table>
    <br>
    Current HamWAN balance is about $16k.<br>
    <br>
    Procedural reminder since we haven't had one of these emails in way
    too long: HamWAN directors have 24 hours to vote upon such spend
    decisions, and members have the same time to weigh in with opinions
    to influence director votes.  Our procedures are documented here:<br>
    <br>
    <a href="http://hamwan.org/Administrative/Constitution.html">http://hamwan.org/Administrative/Constitution.html</a><br>
    <br>
    --Bart<br>
    <br>
  </body>
</html>