<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
</head>
<body>
Woops, forgot to add 2.4GHz access points to the spend request, 1
for each building. They came out to $117.51 total, bringing the new
grand total to $1,311.77.<br>
<br>
--Bart<br>
<br>
<br>
<div class="moz-cite-prefix">On 5/31/2020 10:47 PM, Bart Kus wrote:<br>
</div>
<blockquote type="cite"
cite="mid:210ba29b-8927-856a-b192-f54fb64503e0@bartk.us">
<meta http-equiv="content-type" content="text/html; charset=UTF-8">
Hello,<br>
<br>
We have 4 clients connected to Baldi-S1 (a SISO sector) that are
kind of silly:<br>
<br>
<tt> # INTERFACE RADIO-NAME MAC-ADDRESS AP SIGNAL...
TX-RATE UPTIME</tt><tt><br>
</tt><tt> 0 wlan1 AF7PR-Baldi E4:8D:8C:C6:F5:45 no
-60dBm 32.5... 2d8h51m46s</tt><tt><br>
</tt><tt> 1 wlan1 KD7TQN-Baldi D4:CA:6D:C2:ED:93 no
-65dBm 32.5... 2d8h51m32s</tt><tt><br>
</tt><tt> 2 wlan1 N7OEP/Baldi-B... D4:CA:6D:0D:53:F9 no
-60dBm 32.5... 2d8h51m27s</tt><tt><br>
</tt><tt> 3 wlan1 Rattlesnake-B... 64:D1:54:AF:3F:CD no
-79dBm 19.5... 1d9h35m21s</tt><tt><br>
</tt><br>
They're silly because the first 3 are at the same mountain top,
just a couple hundred feet away in adjacent shacks. This is a
waste of prime long-range spectrum, being used to do local-links.
I'd like to get all the shacks @ Baldi tied together via gigabit
Ethernet, and install access switches at the 2 other shacks so
people there can plug into the LAN directly. This high speed LAN
between all shacks can then be used to allow us to address the 4th
silly client, which is Rattlesnake Mountain. I'd like to install
a dedicated dish on the northernmost tower (fed by the new high
speed LAN) to act as a dedicated high speed link between Baldi and
Rattlesnake. The dish on the Rattlesnake side will also need a
modem upgrade to run at full speed, and I'm including that in this
proposal.<br>
<br>
Here is the rough budget for this spend request:<br>
<br>
<table width="100%" cellspacing="2" cellpadding="2" border="1">
<tbody>
<tr>
<td valign="top"><b>Item</b><b><br>
</b></td>
<td valign="top"><b>Quantity</b><b><br>
</b></td>
<td valign="top"><b>Cost</b><b><br>
</b></td>
<td valign="top"><b>Subtotal</b><b><br>
</b></td>
</tr>
<tr>
<td valign="top">500ft pull rope<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$12.97<br>
</td>
<td valign="top" align="right">$12.97<br>
</td>
</tr>
<tr>
<td valign="top">425ft duct rod<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$111<br>
</td>
<td valign="top" align="right">$111<br>
</td>
</tr>
<tr>
<td valign="top">Taxes for above 2 items<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$11.53<br>
</td>
<td valign="top" align="right">$11.53<br>
</td>
</tr>
<tr>
<td valign="top">CRS112-8P-4S-IN for northernmost building,
feeding Rattlesnake dish w/ PoE and access ports for
clients<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$170<br>
</td>
<td valign="top" align="right">$170<br>
</td>
</tr>
<tr>
<td valign="top">CRS326-24G-2S+RM for middle building,
acting as mid-span switch and providing ports to lots of
devices there<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$185.24<br>
</td>
<td valign="top" align="right">$185.24<br>
</td>
</tr>
<tr>
<td valign="top">Taxes for above 2 items<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$33.04<br>
</td>
<td valign="top" align="right">$33.04<br>
</td>
</tr>
<tr>
<td valign="top">1000ft Shielded CAT5 TC-PRO ToughCable<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$137.68<br>
</td>
<td valign="top" align="right">$137.68<br>
</td>
</tr>
<tr>
<td valign="top">Taxes for above<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$12.80<br>
</td>
<td valign="top" align="right">$12.80<br>
</td>
</tr>
<tr>
<td valign="top">Existing Inventory Estimate:
RB921UAGS-5SHPacD-NM modem<br>
</td>
<td valign="top" align="center">2<br>
</td>
<td valign="top" align="right">$150<br>
</td>
<td valign="top" align="right">$300<br>
</td>
</tr>
<tr>
<td valign="top">Existing Inventory Estimate: mANT30 2ft
microwave dish<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$120<br>
</td>
<td valign="top" align="right">$120<br>
</td>
</tr>
<tr>
<td valign="top">Existing Inventory Estimate: Sleeve30 2ft
microwave dish isolation kit<br>
</td>
<td valign="top" align="center">1<br>
</td>
<td valign="top" align="right">$100<br>
</td>
<td valign="top" align="right">$100<br>
</td>
</tr>
<tr>
<td valign="top">TOTAL COST ESTIMATE<br>
</td>
<td valign="top" align="center"><br>
</td>
<td valign="top" align="right"><br>
</td>
<td valign="top" align="right">$1,194.26<br>
</td>
</tr>
</tbody>
</table>
<br>
Current HamWAN balance is about $16k.<br>
<br>
Procedural reminder since we haven't had one of these emails in
way too long: HamWAN directors have 24 hours to vote upon such
spend decisions, and members have the same time to weigh in with
opinions to influence director votes. Our procedures are
documented here:<br>
<br>
<a href="http://hamwan.org/Administrative/Constitution.html"
moz-do-not-send="true">http://hamwan.org/Administrative/Constitution.html</a><br>
<br>
--Bart<br>
<br>
<br>
<fieldset class="mimeAttachmentHeader"></fieldset>
<pre class="moz-quote-pre" wrap="">_______________________________________________
PSDR mailing list
<a class="moz-txt-link-abbreviated" href="mailto:PSDR@hamwan.org">PSDR@hamwan.org</a>
<a class="moz-txt-link-freetext" href="http://mail.hamwan.net/mailman/listinfo/psdr">http://mail.hamwan.net/mailman/listinfo/psdr</a>
</pre>
</blockquote>
<br>
</body>
</html>